Total distance covered by train is sum of train's length plus length of bridge.
Total time taken by train to cross the bridge = Velocity Total distance
Total distance = Length of train + Length of bridge =100+1000=1100m
Velocity of train =45km/h =1845×5=12.5m/s ∴t=12.51100=88s