The volume of water contained in the vessel would be equal to V=l3=13m3=1m3. Assuming water to be pure so the density of water would be equal to d=1000kg/m3, hence the mass of water contained in the vessel would be equal to m=Vd=1000kg. Thus, the work done would be equal to W=mgh=1000×10×21=5000J